{"id":7087146598580,"title":"Therapist’s Choice® Premium Extra Long 6 Foot (72inchs Long) Lead Wires for TENS and EMS Units – Standard Female Plug (1) 1","handle":"therapist-s-choice®-premium-extra-long-6-foot-72inchs-long-lead-wires-for-tens-and-ems-units-standard-female-plug-1-1","description":"\u003ch3\u003eTherapist’s Choice® Premium Extra Long 6 Foot (72inchs Long) Lead Wires for TENS and EMS Units – Standard Female Plug (1)\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eExtra Long 72 inch, 2 wires per package. (Most lead wires are 42 inches long)\nCompatible with most standard TENS \u0026amp; EMS units. NOT compatible with Empi or\nProspera or SUPPENDON devices. 30 Day Satisfaction Guarantee.\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eExtra Long, Standard shielded plastic female right angle plug, 72 inch wires\u003c\/li\u003e\n \u003cli\u003ePair of 2 extra long leads to connect a total of 4 electrodes\u003c\/li\u003e\n \u003cli\u003ePins fit standard 2mm pigtail electrode pad connectors\u003c\/li\u003e\n \u003cli\u003eCompatible with most standard TENS \u0026amp; EMS units. NOT compatible with Empi or Prospera or SUPPENDON devices\u003c\/li\u003e\n \u003cli\u003eExtra Long Length allows the user to have more freedom and distance from their device for more comfort. These are 72 inches long, most are only 42 inches long.\u003c\/li\u003e\n \u003c\/ul\u003e\n\n","published_at":"2022-03-19T07:54:43+11:00","created_at":"2022-03-19T07:54:43+11:00","vendor":"Therapist's Choice","type":"Electrodes","tags":["auspowers_batchone"],"price":12000,"price_min":12000,"price_max":12000,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":41336431476916,"title":"1","option1":"1","option2":null,"option3":null,"sku":"B08QGVW74G","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"Therapist’s Choice® Premium Extra Long 6 Foot (72inchs Long) Lead Wires for TENS and EMS Units – Standard Female Plug (1) 1 - 1","public_title":"1","options":["1"],"price":12000,"weight":31,"compare_at_price":null,"inventory_management":null,"barcode":"0815290017580","requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/auspowers.com\/cdn\/shop\/products\/B08QGVW74G.jpg?v=1648589624","\/\/auspowers.com\/cdn\/shop\/products\/therapist-s-choice-electrodes-1-therapist-s-choice-premium-extra-long-6-foot-72inchs-long-lead-wires-for-tens-and-ems-units-standard-female-plug-1-1-25209213288628.jpg?v=1788438755","\/\/auspowers.com\/cdn\/shop\/products\/71guihZJOGL.jpg?v=1647636883","\/\/auspowers.com\/cdn\/shop\/products\/810CYuweWbL.jpg?v=1647636883","\/\/auspowers.com\/cdn\/shop\/products\/8174-PdQroL.jpg?v=1647636883","\/\/auspowers.com\/cdn\/shop\/products\/81L20xD8XeL.jpg?v=1647636883"],"featured_image":"\/\/auspowers.com\/cdn\/shop\/products\/B08QGVW74G.jpg?v=1648589624","options":["Package Quantity"],"media":[{"alt":"Therapist’s Choice Premium 6-foot lead wire for TENS and EMS units with standard female plug, used for electrotherapy treatments.","id":25352864071860,"position":1,"preview_image":{"aspect_ratio":1.013,"height":2095,"width":2122,"src":"\/\/auspowers.com\/cdn\/shop\/products\/B08QGVW74G.jpg?v=1648589624"},"aspect_ratio":1.013,"height":2095,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/products\/B08QGVW74G.jpg?v=1648589624","width":2122},{"alt":"Therapist’s Choice premium 6-foot lead wire for TENS and EMS units with standard female plug, designed for electrotherapy treatments.","id":25209213288628,"position":2,"preview_image":{"aspect_ratio":0.642,"height":2560,"width":1643,"src":"\/\/auspowers.com\/cdn\/shop\/products\/therapist-s-choice-electrodes-1-therapist-s-choice-premium-extra-long-6-foot-72inchs-long-lead-wires-for-tens-and-ems-units-standard-female-plug-1-1-25209213288628.jpg?v=1788438755"},"aspect_ratio":0.642,"height":2560,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/products\/therapist-s-choice-electrodes-1-therapist-s-choice-premium-extra-long-6-foot-72inchs-long-lead-wires-for-tens-and-ems-units-standard-female-plug-1-1-25209213288628.jpg?v=1788438755","width":1643},{"alt":"Therapist’s Choice Premium 6-foot lead wire with standard female plug for TENS and EMS units, long and flexible for therapy use.","id":25209213321396,"position":3,"preview_image":{"aspect_ratio":0.75,"height":2560,"width":1920,"src":"\/\/auspowers.com\/cdn\/shop\/products\/71guihZJOGL.jpg?v=1647636883"},"aspect_ratio":0.75,"height":2560,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/products\/71guihZJOGL.jpg?v=1647636883","width":1920},{"alt":"Therapist’s Choice Premium 6-foot lead wire for TENS and EMS units with standard female plug, shown coiled and ready for use.","id":25209213354164,"position":4,"preview_image":{"aspect_ratio":0.75,"height":2560,"width":1920,"src":"\/\/auspowers.com\/cdn\/shop\/products\/810CYuweWbL.jpg?v=1647636883"},"aspect_ratio":0.75,"height":2560,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/products\/810CYuweWbL.jpg?v=1647636883","width":1920},{"alt":"Therapist’s Choice premium 6-foot TENS and EMS lead wire with standard female plug, used with electrotherapy units.","id":25209213386932,"position":5,"preview_image":{"aspect_ratio":0.75,"height":2560,"width":1920,"src":"\/\/auspowers.com\/cdn\/shop\/products\/8174-PdQroL.jpg?v=1647636883"},"aspect_ratio":0.75,"height":2560,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/products\/8174-PdQroL.jpg?v=1647636883","width":1920},{"alt":"Therapist’s Choice premium 6-foot lead wire with standard female plug for TENS and EMS units, shown coiled on a plain background.","id":25209213419700,"position":6,"preview_image":{"aspect_ratio":1.333,"height":1920,"width":2560,"src":"\/\/auspowers.com\/cdn\/shop\/products\/81L20xD8XeL.jpg?v=1647636883"},"aspect_ratio":1.333,"height":1920,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/products\/81L20xD8XeL.jpg?v=1647636883","width":2560}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003eTherapist’s Choice® Premium Extra Long 6 Foot (72inchs Long) Lead Wires for TENS and EMS Units – Standard Female Plug (1)\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eExtra Long 72 inch, 2 wires per package. (Most lead wires are 42 inches long)\nCompatible with most standard TENS \u0026amp; EMS units. NOT compatible with Empi or\nProspera or SUPPENDON devices. 30 Day Satisfaction Guarantee.\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eExtra Long, Standard shielded plastic female right angle plug, 72 inch wires\u003c\/li\u003e\n \u003cli\u003ePair of 2 extra long leads to connect a total of 4 electrodes\u003c\/li\u003e\n \u003cli\u003ePins fit standard 2mm pigtail electrode pad connectors\u003c\/li\u003e\n \u003cli\u003eCompatible with most standard TENS \u0026amp; EMS units. NOT compatible with Empi or Prospera or SUPPENDON devices\u003c\/li\u003e\n \u003cli\u003eExtra Long Length allows the user to have more freedom and distance from their device for more comfort. These are 72 inches long, most are only 42 inches long.\u003c\/li\u003e\n \u003c\/ul\u003e\n\n"}

Therapist’s Choice® Premium Extra Long 6 Foot (72inchs Long) Lead Wires for TENS and EMS Units – Standard Female Plug (1) 1

In Stock. Leaves warehouse within 2 - 3 business days

$120.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

Therapist’s Choice® Premium Extra Long 6 Foot (72inchs Long) Lead Wires for TENS and EMS Units – Standard Female Plug (1)

Extra Long 72 inch, 2 wires per package. (Most lead wires are 42 inches long) Compatible with most standard TENS & EMS units. NOT compatible with Empi or Prospera or SUPPENDON devices. 30 Day Satisfaction Guarantee.

Product Features

  • Extra Long, Standard shielded plastic female right angle plug, 72 inch wires
  • Pair of 2 extra long leads to connect a total of 4 electrodes
  • Pins fit standard 2mm pigtail electrode pad connectors
  • Compatible with most standard TENS & EMS units. NOT compatible with Empi or Prospera or SUPPENDON devices
  • Extra Long Length allows the user to have more freedom and distance from their device for more comfort. These are 72 inches long, most are only 42 inches long.