{"id":7099793277108,"title":"The VoIP Lounge Replacement 9 Foot Short Handset Curly Cord with Extra Long Lead for Allworx IP Phone 9224 9212 9212L 9204 9204G 9202 9202E 9308 9312","handle":"the-voip-lounge-replacement-9-foot-short-handset-curly-cord-with-extra-long-lead-for-allworx-ip-phone-9224-9212-9212l-9204-9204g-9202-9202e-9308-9312","description":"\u003ch3\u003eThe VoIP Lounge Replacement 9 Foot Short Handset Curly Cord with Extra Long Lead for Allworx IP Phone 9224 9212 9212L 9204 9204G 9202 9202E 9308 9312\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eBrand New! The VoIP Lounge replacement 9 foot curly cord with extra long lead\nfor Allworx IP Phones. Cord length is 9' fully stretched and approximately 15\"\ncoiled. Cords \u0026amp; Lengths: As a telecom industry standard, the indicated lengths\nof handset cords are when they are fully stretched out, not when they are\ncoiled in their packaging. Cords are rarely used at their full maximum\nstretched length, so it’s important to choose an appropriate length when\nbuying. Available lengths for most cords are: 7 feet (11 inches coiled \/\nunstretched) 9 feet (15 inches coiled \/ unstretched) 12 feet (22 inches coiled\n\/ unstretched) 25 feet (42 inches coiled \/ unstretched)\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003e9 Feet Fully Stretched, 15 Inches Coiled (See Full Description Below)\u003c\/li\u003e\n \u003cli\u003eFlat Black \/ Charcoal Color\u003c\/li\u003e\n \u003cli\u003eBrand New - Individually bagged\u003c\/li\u003e\n \u003c\/ul\u003e\n\n","published_at":"2022-04-01T20:24:21+11:00","created_at":"2022-04-01T20:24:21+11:00","vendor":"The VoIP Lounge","type":"Telephone Cords","tags":["auspowers_batchfour"],"price":10800,"price_min":10800,"price_max":10800,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":41374863524020,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"B01FMLQKNM","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"The VoIP Lounge Replacement 9 Foot Short Handset Curly Cord with Extra Long Lead for Allworx IP Phone 9224 9212 9212L 9204 9204G 9202 9202E 9308 9312","public_title":null,"options":["Default Title"],"price":10800,"weight":18,"compare_at_price":null,"inventory_management":null,"barcode":"8541728453","requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/auspowers.com\/cdn\/shop\/products\/B01FMLQKNM.jpg?v=1649779569"],"featured_image":"\/\/auspowers.com\/cdn\/shop\/products\/B01FMLQKNM.jpg?v=1649779569","options":["Title"],"media":[{"alt":"The VoIP Lounge 9-foot curly handset cord for Allworx IP phones, featuring extra long lead for easy phone use and flexibility.","id":25530520109236,"position":1,"preview_image":{"aspect_ratio":1.333,"height":1125,"width":1500,"src":"\/\/auspowers.com\/cdn\/shop\/products\/B01FMLQKNM.jpg?v=1649779569"},"aspect_ratio":1.333,"height":1125,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/products\/B01FMLQKNM.jpg?v=1649779569","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003eThe VoIP Lounge Replacement 9 Foot Short Handset Curly Cord with Extra Long Lead for Allworx IP Phone 9224 9212 9212L 9204 9204G 9202 9202E 9308 9312\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eBrand New! The VoIP Lounge replacement 9 foot curly cord with extra long lead\nfor Allworx IP Phones. Cord length is 9' fully stretched and approximately 15\"\ncoiled. Cords \u0026amp; Lengths: As a telecom industry standard, the indicated lengths\nof handset cords are when they are fully stretched out, not when they are\ncoiled in their packaging. Cords are rarely used at their full maximum\nstretched length, so it’s important to choose an appropriate length when\nbuying. Available lengths for most cords are: 7 feet (11 inches coiled \/\nunstretched) 9 feet (15 inches coiled \/ unstretched) 12 feet (22 inches coiled\n\/ unstretched) 25 feet (42 inches coiled \/ unstretched)\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003e9 Feet Fully Stretched, 15 Inches Coiled (See Full Description Below)\u003c\/li\u003e\n \u003cli\u003eFlat Black \/ Charcoal Color\u003c\/li\u003e\n \u003cli\u003eBrand New - Individually bagged\u003c\/li\u003e\n \u003c\/ul\u003e\n\n"}

The VoIP Lounge Replacement 9 Foot Short Handset Curly Cord with Extra Long Lead for Allworx IP Phone 9224 9212 9212L 9204 9204G 9202 9202E 9308 9312

In Stock. Leaves warehouse within 2 - 3 business days

$108.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

The VoIP Lounge Replacement 9 Foot Short Handset Curly Cord with Extra Long Lead for Allworx IP Phone 9224 9212 9212L 9204 9204G 9202 9202E 9308 9312

Brand New! The VoIP Lounge replacement 9 foot curly cord with extra long lead for Allworx IP Phones. Cord length is 9' fully stretched and approximately 15" coiled. Cords & Lengths: As a telecom industry standard, the indicated lengths of handset cords are when they are fully stretched out, not when they are coiled in their packaging. Cords are rarely used at their full maximum stretched length, so it’s important to choose an appropriate length when buying. Available lengths for most cords are: 7 feet (11 inches coiled / unstretched) 9 feet (15 inches coiled / unstretched) 12 feet (22 inches coiled / unstretched) 25 feet (42 inches coiled / unstretched)

Product Features

  • 9 Feet Fully Stretched, 15 Inches Coiled (See Full Description Below)
  • Flat Black / Charcoal Color
  • Brand New - Individually bagged