{"id":7099287470260,"title":"The VoIP Lounge 25 Foot Flat Black Long Handset Receiver Curly Phone Cord with Long Lead","handle":"the-voip-lounge-25-foot-flat-black-long-handset-receiver-curly-phone-cord-with-long-lead","description":"\u003ch3\u003eThe VoIP Lounge 25 Foot Flat Black Long Handset Receiver Curly Phone Cord with Long Lead\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eThe VoIP Lounge Universal Flat Black 25 Foot Handset Cord with long lead. This\nis a flat black cord that is 25 feet long when it is fully extended to its\nmaximum length, and is about 42 inches in its coiled, unstretched state.\nHandset cords are rarely used at their maximum length, and most typically\nusable anywhere from 35% to 75% of their advertised length, depending on how\nmuch you want to stretch them. Once stretched to the maximum length, cords do\nnot retain their original shape or quality, so it's important to choose wisely\nwhen buying. The advertised size of the full maximum extended length is a\nTelecom Industry Standard, and not something that is decided by us, or any\nother manufacturer or seller. Cords \u0026amp; Lengths: Available lengths for most\ncords are: 7 feet (11 inches coiled \/ unstretched) 9 feet (15 inches coiled \/\nunstretched) 12 feet (22 inches coiled \/ unstretched) 25 feet (42 inches\ncoiled \/ unstretched)\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003e25 Feet fully stretched, 3.5 Feet coiled (See Full Description Below)\u003c\/li\u003e\n \u003cli\u003eBlack Color\u003c\/li\u003e\n \u003cli\u003eBrand New - Individually Bagged\u003c\/li\u003e\n \u003cli\u003ePlease read the description regarding Telecom Industry Standard Cord Lengths\u003c\/li\u003e\n \u003c\/ul\u003e\n\n","published_at":"2022-04-01T02:44:20+11:00","created_at":"2022-04-01T02:44:20+11:00","vendor":"The VoIP Lounge","type":"Telephone Cords","tags":["auspowers_batchfour"],"price":13000,"price_min":13000,"price_max":13000,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":41372978348212,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"B07FK33KRY","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"The VoIP Lounge 25 Foot Flat Black Long Handset Receiver Curly Phone Cord with Long Lead","public_title":null,"options":["Default Title"],"price":13000,"weight":109,"compare_at_price":null,"inventory_management":null,"barcode":"5582667555","requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/auspowers.com\/cdn\/shop\/products\/B07FK33KRY.jpg?v=1649766822"],"featured_image":"\/\/auspowers.com\/cdn\/shop\/products\/B07FK33KRY.jpg?v=1649766822","options":["Title"],"media":[{"alt":"Black 25-foot flat handset receiver curly phone cord with long lead from The VoIP Lounge for landline phones.","id":25528040095924,"position":1,"preview_image":{"aspect_ratio":1.333,"height":1920,"width":2560,"src":"\/\/auspowers.com\/cdn\/shop\/products\/B07FK33KRY.jpg?v=1649766822"},"aspect_ratio":1.333,"height":1920,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/products\/B07FK33KRY.jpg?v=1649766822","width":2560}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003eThe VoIP Lounge 25 Foot Flat Black Long Handset Receiver Curly Phone Cord with Long Lead\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eThe VoIP Lounge Universal Flat Black 25 Foot Handset Cord with long lead. This\nis a flat black cord that is 25 feet long when it is fully extended to its\nmaximum length, and is about 42 inches in its coiled, unstretched state.\nHandset cords are rarely used at their maximum length, and most typically\nusable anywhere from 35% to 75% of their advertised length, depending on how\nmuch you want to stretch them. Once stretched to the maximum length, cords do\nnot retain their original shape or quality, so it's important to choose wisely\nwhen buying. The advertised size of the full maximum extended length is a\nTelecom Industry Standard, and not something that is decided by us, or any\nother manufacturer or seller. Cords \u0026amp; Lengths: Available lengths for most\ncords are: 7 feet (11 inches coiled \/ unstretched) 9 feet (15 inches coiled \/\nunstretched) 12 feet (22 inches coiled \/ unstretched) 25 feet (42 inches\ncoiled \/ unstretched)\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003e25 Feet fully stretched, 3.5 Feet coiled (See Full Description Below)\u003c\/li\u003e\n \u003cli\u003eBlack Color\u003c\/li\u003e\n \u003cli\u003eBrand New - Individually Bagged\u003c\/li\u003e\n \u003cli\u003ePlease read the description regarding Telecom Industry Standard Cord Lengths\u003c\/li\u003e\n \u003c\/ul\u003e\n\n"}

The VoIP Lounge 25 Foot Flat Black Long Handset Receiver Curly Phone Cord with Long Lead

In Stock. Leaves warehouse within 2 - 3 business days

$130.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

The VoIP Lounge 25 Foot Flat Black Long Handset Receiver Curly Phone Cord with Long Lead

The VoIP Lounge Universal Flat Black 25 Foot Handset Cord with long lead. This is a flat black cord that is 25 feet long when it is fully extended to its maximum length, and is about 42 inches in its coiled, unstretched state. Handset cords are rarely used at their maximum length, and most typically usable anywhere from 35% to 75% of their advertised length, depending on how much you want to stretch them. Once stretched to the maximum length, cords do not retain their original shape or quality, so it's important to choose wisely when buying. The advertised size of the full maximum extended length is a Telecom Industry Standard, and not something that is decided by us, or any other manufacturer or seller. Cords & Lengths: Available lengths for most cords are: 7 feet (11 inches coiled / unstretched) 9 feet (15 inches coiled / unstretched) 12 feet (22 inches coiled / unstretched) 25 feet (42 inches coiled / unstretched)

Product Features

  • 25 Feet fully stretched, 3.5 Feet coiled (See Full Description Below)
  • Black Color
  • Brand New - Individually Bagged
  • Please read the description regarding Telecom Industry Standard Cord Lengths