{"id":7359379701940,"title":"DIYSELF 2Pack Utility Knife Box Cutter Retractable Blade Heavy Duty(Red) Red","handle":"diyself-2pack-utility-knife-box-cutter-retractable-blade-heavy-dutyred-red","description":"\u003ch3\u003eDIYSELF 2Pack Utility Knife Box Cutter Retractable Blade Heavy Duty(Red)\u003c\/h3\u003e\n\u003cp id=\"b\"\u003e\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eWHAT YOU WANTED: Economical and disposable box cutting blades.Comfortable grip and wider retractable blade.\u003c\/li\u003e\n \u003cli\u003eWIDELY USED:Ready to use, cut and toss or keep some around as a spare utility knife in your garage, tool kit, home and office.\u003c\/li\u003e\n \u003cli\u003eEFFICIENT \u0026amp; EASY: Razor blade for deep exact cuts. Prevent blade slipping with the lock tab.\u003c\/li\u003e\n \u003cli\u003ePACKAGE CONTAINS: 2-piece heavy duty retractable box cutters. The utility knife has 8 different colors among which black, blue, green, orange, pink, red, silver and yellow. Please choose the one you prefer.\u003c\/li\u003e\n \u003c\/ul\u003e","published_at":"2023-03-04T03:23:48+11:00","created_at":"2023-03-04T03:23:57+11:00","vendor":"DIYSELF","type":"","tags":["industrial_Dec2022"],"price":12900,"price_min":12900,"price_max":12900,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":42198078095540,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"B08NX1XYBN","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"DIYSELF 2Pack Utility Knife Box Cutter Retractable Blade Heavy Duty(Red) Red","public_title":null,"options":["Default Title"],"price":12900,"weight":109,"compare_at_price":null,"inventory_management":null,"barcode":"780744215945","requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/auspowers.com\/cdn\/shop\/products\/B08NX1XYBN.jpg?v=1677913586","\/\/auspowers.com\/cdn\/shop\/products\/713LfrmkoXS.jpg?v=1677860638","\/\/auspowers.com\/cdn\/shop\/products\/71fAAWzapmS.jpg?v=1677860638","\/\/auspowers.com\/cdn\/shop\/products\/61BobgA_wbS.jpg?v=1677860638","\/\/auspowers.com\/cdn\/shop\/products\/617NsKETpbS.jpg?v=1677860638","\/\/auspowers.com\/cdn\/shop\/products\/716J77IhJGS.jpg?v=1677860638"],"featured_image":"\/\/auspowers.com\/cdn\/shop\/products\/B08NX1XYBN.jpg?v=1677913586","options":["Title"],"media":[{"alt":"DIYSELF 2-pack red utility knife box cutter with retractable blades, heavy-duty design for precise cutting tasks.","id":28326257033396,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1650,"width":1650,"src":"\/\/auspowers.com\/cdn\/shop\/products\/B08NX1XYBN.jpg?v=1677913586"},"aspect_ratio":1.0,"height":1650,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/products\/B08NX1XYBN.jpg?v=1677913586","width":1650},{"alt":"DIYSELF 2-pack red utility knives with retractable blades, heavy-duty box cutters perfect for cutting and crafting tasks.","id":28322917974196,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1650,"width":1650,"src":"\/\/auspowers.com\/cdn\/shop\/products\/713LfrmkoXS.jpg?v=1677860638"},"aspect_ratio":1.0,"height":1650,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/products\/713LfrmkoXS.jpg?v=1677860638","width":1650},{"alt":"DIYSELF 2-pack red utility knives with retractable blades, heavy-duty box cutters for versatile cutting tasks.","id":28322918006964,"position":3,"preview_image":{"aspect_ratio":1.0,"height":1650,"width":1650,"src":"\/\/auspowers.com\/cdn\/shop\/products\/71fAAWzapmS.jpg?v=1677860638"},"aspect_ratio":1.0,"height":1650,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/products\/71fAAWzapmS.jpg?v=1677860638","width":1650},{"alt":"DIYSELF 2-pack red utility knife box cutter with retractable blades, heavy-duty design, suitable for cutting and opening boxes.","id":28322918039732,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1650,"width":1650,"src":"\/\/auspowers.com\/cdn\/shop\/products\/61BobgA_wbS.jpg?v=1677860638"},"aspect_ratio":1.0,"height":1650,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/products\/61BobgA_wbS.jpg?v=1677860638","width":1650},{"alt":"DIYSELF 2-pack red utility knives with retractable blades, heavy-duty box cutters for versatile cutting tasks.","id":28322918072500,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1650,"width":1650,"src":"\/\/auspowers.com\/cdn\/shop\/products\/617NsKETpbS.jpg?v=1677860638"},"aspect_ratio":1.0,"height":1650,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/products\/617NsKETpbS.jpg?v=1677860638","width":1650},{"alt":"DIYSELF 2-pack red utility knives with retractable blades, heavy-duty box cutters for versatile cutting tasks.","id":28322918105268,"position":6,"preview_image":{"aspect_ratio":1.0,"height":1650,"width":1650,"src":"\/\/auspowers.com\/cdn\/shop\/products\/716J77IhJGS.jpg?v=1677860638"},"aspect_ratio":1.0,"height":1650,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/products\/716J77IhJGS.jpg?v=1677860638","width":1650}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003eDIYSELF 2Pack Utility Knife Box Cutter Retractable Blade Heavy Duty(Red)\u003c\/h3\u003e\n\u003cp id=\"b\"\u003e\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eWHAT YOU WANTED: Economical and disposable box cutting blades.Comfortable grip and wider retractable blade.\u003c\/li\u003e\n \u003cli\u003eWIDELY USED:Ready to use, cut and toss or keep some around as a spare utility knife in your garage, tool kit, home and office.\u003c\/li\u003e\n \u003cli\u003eEFFICIENT \u0026amp; EASY: Razor blade for deep exact cuts. Prevent blade slipping with the lock tab.\u003c\/li\u003e\n \u003cli\u003ePACKAGE CONTAINS: 2-piece heavy duty retractable box cutters. The utility knife has 8 different colors among which black, blue, green, orange, pink, red, silver and yellow. Please choose the one you prefer.\u003c\/li\u003e\n \u003c\/ul\u003e"}

DIYSELF 2Pack Utility Knife Box Cutter Retractable Blade Heavy Duty(Red) Red

In Stock. Leaves warehouse within 2 - 3 business days

$129.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

DIYSELF 2Pack Utility Knife Box Cutter Retractable Blade Heavy Duty(Red)

Product Features

  • WHAT YOU WANTED: Economical and disposable box cutting blades.Comfortable grip and wider retractable blade.
  • WIDELY USED:Ready to use, cut and toss or keep some around as a spare utility knife in your garage, tool kit, home and office.
  • EFFICIENT & EASY: Razor blade for deep exact cuts. Prevent blade slipping with the lock tab.
  • PACKAGE CONTAINS: 2-piece heavy duty retractable box cutters. The utility knife has 8 different colors among which black, blue, green, orange, pink, red, silver and yellow. Please choose the one you prefer.