{"id":7860554793140,"title":"100pcs 5mm White Lights LED Diodes Flat Lens 29mm Long Lead (DC 3V) +100pcs Resistors (for DC 6-12V) Included, Bright Bulb Lamps Light Emitting Diode [03] White \/ 100pcs 5mm Flat Top","handle":"100pcs-5mm-white-lights-led-diodes-flat-lens-29mm-long-lead-dc-3v-100pcs-resistors-for-dc-6-12v-included-bright-bulb-lamps-light-emitting-diode-03-white-100pcs-5mm-flat-top","description":"\u003ch3\u003e100pcs 5mm White Lights LED Diodes Flat Lens 29mm Long Lead (DC 3V) +100pcs Resistors (for DC 6-12V) Included, Bright Bulb Lamps Light Emitting Diode\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eLow Energy Consumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature. Get other LED models? Please search \"EDGELEC Diodes\".\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eProduct Overview: 100 pcs LED Diodes + 100 pcs Resistors\u003c\/li\u003e\n \u003cli\u003eProduct Features: White Lights \/ 5mm Flat Clear Lens Lens\u003c\/li\u003e\n \u003cli\u003eProduct Parameters: 29mm Long Lead \/ DC 3.0V-3.2V (IF=20mA) \/ 0.06 Watts \/ 2pin \/ DIP LEDs\u003c\/li\u003e\n \u003cli\u003eProduct Parameters: Luminance Brighter Up To +20% \/ Wavelength 6000K-9000K \/ 60 Viewing Angle \/ Single LED Diodes Wight: 0.24g\u003c\/li\u003e\n \u003cli\u003eAccessories: 100pcs 430ohm (For DC 6-12V) 1\/4 Watt Metal Film Resistors Include \/ 1% Tolerance\u003c\/li\u003e\n \u003c\/ul\u003e","published_at":"2024-10-11T10:36:04+11:00","created_at":"2024-10-11T05:26:44+11:00","vendor":"EDGELEC","type":"LED Lamps","tags":["industrial_Aug2024_update"],"price":11600,"price_min":11600,"price_max":11600,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":43644050735284,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"B0785FPG3T","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"100pcs 5mm White Lights LED Diodes Flat Lens 29mm Long Lead (DC 3V) +100pcs Resistors (for DC 6-12V) Included, Bright Bulb Lamps Light Emitting Diode [03] White \/ 100pcs 5mm Flat Top","public_title":null,"options":["Default Title"],"price":11600,"weight":50,"compare_at_price":null,"inventory_management":"shopify","barcode":"611355169177","requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/auspowers.com\/cdn\/shop\/files\/B0785FPG3T.jpg?v=1728631205","\/\/auspowers.com\/cdn\/shop\/files\/51IqwHBJAIL.jpg?v=1728584806","\/\/auspowers.com\/cdn\/shop\/files\/71e6kEpS-YL_f8f0b835-647d-40f2-826b-363b4e79c203.jpg?v=1728584806","\/\/auspowers.com\/cdn\/shop\/files\/61AOcfJw81L.jpg?v=1728584806","\/\/auspowers.com\/cdn\/shop\/files\/51qe9GPcSiL.jpg?v=1728584807"],"featured_image":"\/\/auspowers.com\/cdn\/shop\/files\/B0785FPG3T.jpg?v=1728631205","options":["Title"],"media":[{"alt":"Set of 100 white 5mm LED lamps with flat lenses, 29mm leads, including resistors for DC 6-12V, ideal for electronics projects.","id":30846711169204,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1300,"width":1300,"src":"\/\/auspowers.com\/cdn\/shop\/files\/B0785FPG3T.jpg?v=1728631205"},"aspect_ratio":1.0,"height":1300,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/files\/B0785FPG3T.jpg?v=1728631205","width":1300},{"alt":"Set of 100 white 5mm LED lamps with flat lenses and long leads, includes resistors for DC 6-12V, by EDGELEC.","id":30844375597236,"position":2,"preview_image":{"aspect_ratio":1.779,"height":768,"width":1366,"src":"\/\/auspowers.com\/cdn\/shop\/files\/51IqwHBJAIL.jpg?v=1728584806"},"aspect_ratio":1.779,"height":768,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/files\/51IqwHBJAIL.jpg?v=1728584806","width":1366},{"alt":"Set of 100 white 5mm LED diodes with flat lenses and resistors, ideal for electronic projects and lighting applications.","id":30844375630004,"position":3,"preview_image":{"aspect_ratio":1.5,"height":1067,"width":1600,"src":"\/\/auspowers.com\/cdn\/shop\/files\/71e6kEpS-YL_f8f0b835-647d-40f2-826b-363b4e79c203.jpg?v=1728584806"},"aspect_ratio":1.5,"height":1067,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/files\/71e6kEpS-YL_f8f0b835-647d-40f2-826b-363b4e79c203.jpg?v=1728584806","width":1600},{"alt":"Edgelec 100pcs 5mm white LED diodes with flat lens, 29mm leads, includes resistors for DC 6-12V, bright light bulbs for electronic projects.","id":30844375662772,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1300,"width":1300,"src":"\/\/auspowers.com\/cdn\/shop\/files\/61AOcfJw81L.jpg?v=1728584806"},"aspect_ratio":1.0,"height":1300,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/files\/61AOcfJw81L.jpg?v=1728584806","width":1300},{"alt":"Edgelec 100pcs 5mm white LED lamps with flat lens, 29mm leads, plus resistors for 6-12V circuits, bright light emitting diodes.","id":30844375695540,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1300,"width":1300,"src":"\/\/auspowers.com\/cdn\/shop\/files\/51qe9GPcSiL.jpg?v=1728584807"},"aspect_ratio":1.0,"height":1300,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/files\/51qe9GPcSiL.jpg?v=1728584807","width":1300}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003e100pcs 5mm White Lights LED Diodes Flat Lens 29mm Long Lead (DC 3V) +100pcs Resistors (for DC 6-12V) Included, Bright Bulb Lamps Light Emitting Diode\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eLow Energy Consumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature. Get other LED models? Please search \"EDGELEC Diodes\".\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eProduct Overview: 100 pcs LED Diodes + 100 pcs Resistors\u003c\/li\u003e\n \u003cli\u003eProduct Features: White Lights \/ 5mm Flat Clear Lens Lens\u003c\/li\u003e\n \u003cli\u003eProduct Parameters: 29mm Long Lead \/ DC 3.0V-3.2V (IF=20mA) \/ 0.06 Watts \/ 2pin \/ DIP LEDs\u003c\/li\u003e\n \u003cli\u003eProduct Parameters: Luminance Brighter Up To +20% \/ Wavelength 6000K-9000K \/ 60 Viewing Angle \/ Single LED Diodes Wight: 0.24g\u003c\/li\u003e\n \u003cli\u003eAccessories: 100pcs 430ohm (For DC 6-12V) 1\/4 Watt Metal Film Resistors Include \/ 1% Tolerance\u003c\/li\u003e\n \u003c\/ul\u003e"}

100pcs 5mm White Lights LED Diodes Flat Lens 29mm Long Lead (DC 3V) +100pcs Resistors (for DC 6-12V) Included, Bright Bulb Lamps Light Emitting Diode [03] White / 100pcs 5mm Flat Top

In Stock. Leaves warehouse within 2 - 3 business days

$116.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

100pcs 5mm White Lights LED Diodes Flat Lens 29mm Long Lead (DC 3V) +100pcs Resistors (for DC 6-12V) Included, Bright Bulb Lamps Light Emitting Diode

Low Energy Consumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature. Get other LED models? Please search "EDGELEC Diodes".

Product Features

  • Product Overview: 100 pcs LED Diodes + 100 pcs Resistors
  • Product Features: White Lights / 5mm Flat Clear Lens Lens
  • Product Parameters: 29mm Long Lead / DC 3.0V-3.2V (IF=20mA) / 0.06 Watts / 2pin / DIP LEDs
  • Product Parameters: Luminance Brighter Up To +20% / Wavelength 6000K-9000K / 60 Viewing Angle / Single LED Diodes Wight: 0.24g
  • Accessories: 100pcs 430ohm (For DC 6-12V) 1/4 Watt Metal Film Resistors Include / 1% Tolerance