{"id":7860554891444,"title":"100pcs 3mm Yellow Flicker Flickering LED Diodes Candle Flicking Lights Clear Round Lens 29mm Long Lead DC 2V Light Emitting Diode Lamp Bulb +100pcs Resistors (470ohm for DC 6-12V) Included [E] 3mm Flickering Light [06] Yellow \/ 100pcs","handle":"100pcs-3mm-yellow-flicker-flickering-led-diodes-candle-flicking-lights-clear-round-lens-29mm-long-lead-dc-2v-light-emitting-diode-lamp-bulb-100pcs-resistors-470ohm-for-dc-6-12v-included-e-3mm-flickering-light-06-yellow-100pcs","description":"\u003ch3\u003e100pcs 3mm Yellow Flicker Flickering LED Diodes Candle Flicking Lights Clear Round Lens 29mm Long Lead DC 2V Light Emitting Diode Lamp Bulb +100pcs Resistors (470ohm for DC 6-12V) Included\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eLow Energy Consumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature. Get other LED models? Please search \"EDGELEC Diodes\".\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eProduct Overview: 100 pcs LED Diodes + 100 pcs Resistors\u003c\/li\u003e\n \u003cli\u003eProduct Features: Yellow Lights Flickering \/ 3mm Round Clear Lens \/ 29mm Long Lead\u003c\/li\u003e\n \u003cli\u003eProduct Parameters: Candle Lights Keep Flickering \/ DC 2.0V-2.2V (IF=20mA) \/ 0.06 Watts \/ 2pin \/ DIP LEDs\u003c\/li\u003e\n \u003cli\u003eProduct Parameters: Luminance Brighter Up To +20% \/ Wavelength 585nm-595nm \/ 30 Viewing Angle \/ Single LED Diodes Wight: 0.16g\u003c\/li\u003e\n \u003cli\u003eAccessories: 100pcs 470ohm (For DC 6-12V) 1\/4 Watt Metal Film Resistors Included \/ 1% Tolerance\u003c\/li\u003e\n \u003c\/ul\u003e","published_at":"2024-10-11T10:36:01+11:00","created_at":"2024-10-11T05:26:50+11:00","vendor":"EDGELEC","type":"LED Lamps","tags":["industrial_Aug2024_update"],"price":12600,"price_min":12600,"price_max":12600,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":43644050964660,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"B0785DQ8FD","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"100pcs 3mm Yellow Flicker Flickering LED Diodes Candle Flicking Lights Clear Round Lens 29mm Long Lead DC 2V Light Emitting Diode Lamp Bulb +100pcs Resistors (470ohm for DC 6-12V) Included [E] 3mm Flickering Light [06] Yellow \/ 100pcs","public_title":null,"options":["Default Title"],"price":12600,"weight":50,"compare_at_price":null,"inventory_management":"shopify","barcode":"611355168071","requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/auspowers.com\/cdn\/shop\/files\/B0785DQ8FD.jpg?v=1728631222","\/\/auspowers.com\/cdn\/shop\/files\/51IqwHBJAIL_631b244b-4760-4f8f-a550-187e37cf3eb8.jpg?v=1728584812","\/\/auspowers.com\/cdn\/shop\/files\/71e6kEpS-YL_a7d8b997-0c06-4071-80ab-3e28994a31ef.jpg?v=1728584812","\/\/auspowers.com\/cdn\/shop\/files\/61MwHsW3elL.jpg?v=1728584813","\/\/auspowers.com\/cdn\/shop\/files\/51JYvsG1ClL.jpg?v=1728584812"],"featured_image":"\/\/auspowers.com\/cdn\/shop\/files\/B0785DQ8FD.jpg?v=1728631222","options":["Title"],"media":[{"alt":"Set of 100 yellow 3mm flickering LED diode lamps with clear round lenses, 29mm leads, includes resistors for DC 6-12V lighting projects.","id":30846711627956,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1300,"width":1300,"src":"\/\/auspowers.com\/cdn\/shop\/files\/B0785DQ8FD.jpg?v=1728631222"},"aspect_ratio":1.0,"height":1300,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/files\/B0785DQ8FD.jpg?v=1728631222","width":1300},{"alt":"Set of 100 yellow flickering LED diodes with clear round lenses, 3mm size, long leads, including 470-ohm resistors for DC 6-12V.","id":30844376940724,"position":2,"preview_image":{"aspect_ratio":1.779,"height":768,"width":1366,"src":"\/\/auspowers.com\/cdn\/shop\/files\/51IqwHBJAIL_631b244b-4760-4f8f-a550-187e37cf3eb8.jpg?v=1728584812"},"aspect_ratio":1.779,"height":768,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/files\/51IqwHBJAIL_631b244b-4760-4f8f-a550-187e37cf3eb8.jpg?v=1728584812","width":1366},{"alt":"Set of 100 yellow flickering LED diodes with clear round lenses, 3mm size, long leads, and resistors for DIY lighting projects.","id":30844376973492,"position":3,"preview_image":{"aspect_ratio":1.5,"height":1067,"width":1600,"src":"\/\/auspowers.com\/cdn\/shop\/files\/71e6kEpS-YL_a7d8b997-0c06-4071-80ab-3e28994a31ef.jpg?v=1728584812"},"aspect_ratio":1.5,"height":1067,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/files\/71e6kEpS-YL_a7d8b997-0c06-4071-80ab-3e28994a31ef.jpg?v=1728584812","width":1600},{"alt":"Set of 100 yellow 3mm flickering LED diodes with clear lenses, 29mm leads, and resistors for candle-like lighting projects.","id":30844377006260,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1300,"width":1300,"src":"\/\/auspowers.com\/cdn\/shop\/files\/61MwHsW3elL.jpg?v=1728584813"},"aspect_ratio":1.0,"height":1300,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/files\/61MwHsW3elL.jpg?v=1728584813","width":1300},{"alt":"Set of 100 yellow 3mm flickering LED diodes with clear round lenses, long leads, and resistors for DC 2V lighting projects.","id":30844377039028,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1300,"width":1300,"src":"\/\/auspowers.com\/cdn\/shop\/files\/51JYvsG1ClL.jpg?v=1728584812"},"aspect_ratio":1.0,"height":1300,"media_type":"image","src":"\/\/auspowers.com\/cdn\/shop\/files\/51JYvsG1ClL.jpg?v=1728584812","width":1300}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003e100pcs 3mm Yellow Flicker Flickering LED Diodes Candle Flicking Lights Clear Round Lens 29mm Long Lead DC 2V Light Emitting Diode Lamp Bulb +100pcs Resistors (470ohm for DC 6-12V) Included\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eLow Energy Consumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature. Get other LED models? Please search \"EDGELEC Diodes\".\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eProduct Overview: 100 pcs LED Diodes + 100 pcs Resistors\u003c\/li\u003e\n \u003cli\u003eProduct Features: Yellow Lights Flickering \/ 3mm Round Clear Lens \/ 29mm Long Lead\u003c\/li\u003e\n \u003cli\u003eProduct Parameters: Candle Lights Keep Flickering \/ DC 2.0V-2.2V (IF=20mA) \/ 0.06 Watts \/ 2pin \/ DIP LEDs\u003c\/li\u003e\n \u003cli\u003eProduct Parameters: Luminance Brighter Up To +20% \/ Wavelength 585nm-595nm \/ 30 Viewing Angle \/ Single LED Diodes Wight: 0.16g\u003c\/li\u003e\n \u003cli\u003eAccessories: 100pcs 470ohm (For DC 6-12V) 1\/4 Watt Metal Film Resistors Included \/ 1% Tolerance\u003c\/li\u003e\n \u003c\/ul\u003e"}

100pcs 3mm Yellow Flicker Flickering LED Diodes Candle Flicking Lights Clear Round Lens 29mm Long Lead DC 2V Light Emitting Diode Lamp Bulb +100pcs Resistors (470ohm for DC 6-12V) Included [E] 3mm Flickering Light [06] Yellow / 100pcs

In Stock. Leaves warehouse within 2 - 3 business days

$126.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

100pcs 3mm Yellow Flicker Flickering LED Diodes Candle Flicking Lights Clear Round Lens 29mm Long Lead DC 2V Light Emitting Diode Lamp Bulb +100pcs Resistors (470ohm for DC 6-12V) Included

Low Energy Consumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature. Get other LED models? Please search "EDGELEC Diodes".

Product Features

  • Product Overview: 100 pcs LED Diodes + 100 pcs Resistors
  • Product Features: Yellow Lights Flickering / 3mm Round Clear Lens / 29mm Long Lead
  • Product Parameters: Candle Lights Keep Flickering / DC 2.0V-2.2V (IF=20mA) / 0.06 Watts / 2pin / DIP LEDs
  • Product Parameters: Luminance Brighter Up To +20% / Wavelength 585nm-595nm / 30 Viewing Angle / Single LED Diodes Wight: 0.16g
  • Accessories: 100pcs 470ohm (For DC 6-12V) 1/4 Watt Metal Film Resistors Included / 1% Tolerance