EEEEE (20 Types) 301pcs Long Lead 5mm Mini LED Lights Emitting Diode Assortment Kit for Tiny Small Miniature Arduino Accessories and Lighting Model with Assorted Clear Dual RGB WS2812B Diodes
EEEEE (20 Types) 301pcs Long Lead 5mm Mini LED Lights Emitting Diode Assortment Kit for Tiny Small Miniature Arduino Accessories and Lighting Model with Assorted Clear Dual RGB WS2812B Diodes
5mm LED Assortment 20 types, 301pcs Long Lead LEDs 20 individual compartments with lids and labelsDiffused LED (Red Green Yellow Blue Orange)ClearLED (Red Green Yellow Blue Orange ,Pink, Violet, White)Red Flashing LEDDual Color LED( Red/Yellow, Red/Green, Green/Blue). Common groundRainbow Changing LEDRGB Flash, Common ground WS2812 color bar Packaging 20 Individual CompartmentsLong LEAD (29mm) 2814 LED RING Capacitor Assortment P10 LED Panel DIode Assortment Resistor Book Linear Voltage Regulator Kit Quantity and Size 8/2/16/24 rings 304 pcs 0.1uF-2200uF 16x32cm 512 Leds 250pcs 16 Models 1095pcs 61 values 50 pcs 10 Values Transistor Assortment Kit Ceramic Capacitor Assortment Kit Inductor Assortment Kit MOSFET Assortment Kit Diode Assortment Kit IC Assortment Kit EEEEE 300 pcs 30 models 300 pcs 30 models 160 pcs 20 Values 70 pcs 10 Values 250 pcs 16 Models 161 pcs 20 Values
Product Features
- Long lead LEDs, 20 individual compartments with lids and labels
- 8 different colors (Pink Violet Red Green Yellow Blue Orange White) with Both Diffused and Clear Options
- Flashing RED LED, DUAL Color LED( RED/YELLOW, RED/GREEEN, GREEN/BLUE)
- Multi color LED (Tri-Color RGB led)
- WS2812 RGB LED BAR (8 leds in a row)
Related Products
EDGELEC 3mm 6 Colors x 20pcs...
![[Australia - AusPower] - EDGELEC 3mm 6 Colors x 20pcs (120pcs) Assorted Colors Lights LED Diodes (Colored Lens) Diffused Round Lens 29mm Long Lead +200pcs Resistors (for DC 6-12V) Included,Bulb Lamps Light Emitting Diode 3mm Constant Light [01] 6 Color X 20pcs / 120pcs](http://auspowers.com/cdn/shop/products/B077X96HDR_1024x.jpg?v=1648590830)
EDGELEC 3mm 6 Colors x 20pcs (120pcs) Assorted Colors Lights LED Diodes (Colored Lens) Diffused Round Lens 29mm Long Lead +200pcs Resistors (for DC 6-12V) Included,Bulb Lamps Light Emitting Diode 3mm Constant Light [01] 6 Color X 20pcs / 120pcs
$86.00 AUD
EDGELEC 3mm 6 Colors x 20pcs (120pcs) Assorted Colors Lights LED Diodes (Colored Lens) Diffused Round Lens 29mm Long Lead +200pcs Resistors (for DC 6-12V) Included,Bulb Lamps Light Emitting Diode Low Energy Consumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. Soldering Condition (Manual...
Chanzon 5mm IR Infrared LED Diod...
![[Australia - AusPower] - Chanzon 5mm IR Infrared LED Diode Emitter + Receiver 940nm Sender Reciver Kit + VS1838B 1838 Sensor Ray Night Vision 940 nm 20pcs Lighting Lamp Bulbs Assortment for Arduino Raspberry A) 5mm Ir Led Diode Kit (20pcs)](http://auspowers.com/cdn/shop/products/B07TLBJR5J_1024x.jpg?v=1648590759)
Chanzon 5mm IR Infrared LED Diode Emitter + Receiver 940nm Sender Reciver Kit + VS1838B 1838 Sensor Ray Night Vision 940 nm 20pcs Lighting Lamp Bulbs Assortment for Arduino Raspberry A) 5mm Ir Led Diode Kit (20pcs)
$81.00 AUD
Chanzon 5mm IR Infrared LED Diode Emitter + Receiver 940nm Sender Reciver Kit + VS1838B 1838 Sensor Ray Night Vision 940 nm 20pcs Lighting Lamp Bulbs Assortment for Arduino Raspberry Product Features Overview: 10pcs 940nm Sender with Emitting Angle 45 Degrees, 5pcs 940nm Receiver with Receive Angle 30 Degrees, 5pcs HX1838 VS1838B ...
Chanzon 100pcs (10 colors x 10pc...
![[Australia - AusPower] - Chanzon 100pcs (10 colors x 10pcs) 5mm LED Diode Lights Assortment (Clear Transparent Lens) H&PC-59042 Emitting Lighting Bulb Lamp Assorted Kit Variety Color White Red Yellow Green Blue Orange UV Pink A) 10 Colors X 10pcs = 100pcs](http://auspowers.com/cdn/shop/products/B01AUI4VSI_1024x.jpg?v=1648590204)
Chanzon 100pcs (10 colors x 10pcs) 5mm LED Diode Lights Assortment (Clear Transparent Lens) H&PC-59042 Emitting Lighting Bulb Lamp Assorted Kit Variety Color White Red Yellow Green Blue Orange UV Pink A) 10 Colors X 10pcs = 100pcs
$84.00 AUD
Chanzon 100pcs (10 colors x 10pcs) 5mm LED Diode Lights Assortment (Clear Transparent Lens) H&PC-59042 Emitting Lighting Bulb Lamp Assorted Kit Variety Color White Red Yellow Green Blue Orange UV Pink Product Features Overview: 5 mm LED Diode Light Assortment Kit DC (20mA), Round Lens (Clear Transparent) 2 Leads, 10 colors x 1...
Phinlion Super Bright DE3175 LED...
![[Australia - AusPower] - Phinlion Super Bright DE3175 LED Blue Bulb 3030 6-SMD Festoon 1.25" 31mm DE3021 DE3022 LED Bulbs for Car Interior Map Reading Dome Trunk Courtesy Light, Pack of 4](http://auspowers.com/cdn/shop/products/B08FSQLVCD_1024x.jpg?v=1648590158)
Phinlion Super Bright DE3175 LED Blue Bulb 3030 6-SMD Festoon 1.25" 31mm DE3021 DE3022 LED Bulbs for Car Interior Map Reading Dome Trunk Courtesy Light, Pack of 4
$104.00 AUD
Phinlion Super Bright DE3175 LED Blue Bulb 3030 6-SMD Festoon 1.25" 31mm DE3021 DE3022 LED Bulbs for Car Interior Map Reading Dome Trunk Courtesy Light, Pack of 4 Specifications:LED Chip: 3030 SMDVoltage: 10~30V(fits 12V/24V vehicles)Color: blueLumens: 500lmFeatures:500 Lumens super brightNon-polarity design, easy to install plug and playBuilt-i...
(100 Pcs) MCIGICM 5mm LED Light...
![[Australia - AusPower] - (100 Pcs) MCIGICM 5mm LED Light Diodes, LED Circuit Assorted Kit for Science Project Experiment (Multi-Colored - 5 Color) Multi-colored - 5 Color](http://auspowers.com/cdn/shop/products/B07PG84V17_1024x.jpg?v=1648589610)
(100 Pcs) MCIGICM 5mm LED Light Diodes, LED Circuit Assorted Kit for Science Project Experiment (Multi-Colored - 5 Color) Multi-colored - 5 Color
$78.00 AUD
(100 Pcs) MCIGICM 5mm LED Light Diodes, LED Circuit Assorted Kit for Science Project Experiment (Multi-Colored - 5 Color) Product Features 5mm LED Diodes Kit Includes 100 Pcs 5mm Led lights in a variety of colors. 5 Colors -- White/Red/Green/Blue/Yellow Forward voltage: W/G/B:3V-3.2V R/Y:2V-2.2V Max. current: 20...
200 Pieces LED Diode Lights, 3mm...
![[Australia - AusPower] - 200 Pieces LED Diode Lights, 3mm and 5mm LED Lights Emitting Diodes Assortment Set Kit for White Red Blue Green Yellow 200 Count (Pack of 1)](http://auspowers.com/cdn/shop/products/B09LH517RL_1024x.jpg?v=1648589396)
200 Pieces LED Diode Lights, 3mm and 5mm LED Lights Emitting Diodes Assortment Set Kit for White Red Blue Green Yellow 200 Count (Pack of 1)
$87.00 AUD
200 Pieces LED Diode Lights, 3mm and 5mm LED Lights Emitting Diodes Assortment Set Kit for White Red Blue Green Yellow 3mm and 5mm Diffused and Clear Assorted LED Kit 5 Colors (Pack of 200) Read more 3mm & 5mm Light Emitting Diodes Environmental Material: LED diode lights are made of resin and colloid. Do not contain harmful elements to the ...
EDGELEC 20pcs 0402 0603 0805 120...
![[Australia - AusPower] - EDGELEC 20pcs 0402 0603 0805 1206 Pre Wired SMD LED Light Emitting Diode Micro Litz Length 7.8in. Soldered White Red Green Yellow Blue Orange Pink UV (20pcs DC 3V 0402 White Prewired Mini Lights) [1] White 0402 Prewired](http://auspowers.com/cdn/shop/products/B07DJBBR3G_1024x.jpg?v=1648589049)
EDGELEC 20pcs 0402 0603 0805 1206 Pre Wired SMD LED Light Emitting Diode Micro Litz Length 7.8in. Soldered White Red Green Yellow Blue Orange Pink UV (20pcs DC 3V 0402 White Prewired Mini Lights) [1] White 0402 Prewired
$91.00 AUD
EDGELEC 20pcs 0402 0603 0805 1206 Pre Wired SMD LED Light Emitting Diode Micro Litz Length 7.8in. Soldered White Red Green Yellow Blue Orange Pink UV (20pcs DC 3V 0402 White Prewired Mini Lights) Ultra bright lighting, low energy consumption and low heat. Industrial standard size, convenient for cperation. Storage conditions: Drying preservatio...
25 pcs Pre-soldered Micro Litz W...
![[Australia - AusPower] - 25 pcs Pre-soldered Micro Litz Wired Leads Pure White SMD Led 0603 ((Warm White Red Green Yellow Blue Pink UV Available)) (1)pure White 25 Count (Pack of 1)](http://auspowers.com/cdn/shop/products/B07P5MYG1X_1024x.jpg?v=1648587575)
25 pcs Pre-soldered Micro Litz Wired Leads Pure White SMD Led 0603 ((Warm White Red Green Yellow Blue Pink UV Available)) (1)pure White 25 Count (Pack of 1)
$88.00 AUD
25 pcs Pre-soldered Micro Litz Wired Leads Pure White SMD Led 0603 ((Warm White Red Green Yellow Blue Pink UV Available)) This pre-wired LED is Super small with resin cover to protect, with 10cm wired,Super strong LEDs and wire, The wire is bendable, it easy to fix any shape as you like You can connect with any 3V battery directly All LEDs work ...
DiCUNO 100Pcs (10 Colors × 10Pcs...
![[Australia - AusPower] - DiCUNO 100Pcs (10 Colors × 10Pcs) 5MM Pre Wired 12V LED Diodes, 9.4 Inch/24CM Ultra Bright Light Emitting Diodes Assorted Color Kit Box for Circuit Science Experiment, DIY Lighting Projects 10 Colors](http://auspowers.com/cdn/shop/products/B07VCJWFBK_1024x.jpg?v=1648586595)
DiCUNO 100Pcs (10 Colors × 10Pcs) 5MM Pre Wired 12V LED Diodes, 9.4 Inch/24CM Ultra Bright Light Emitting Diodes Assorted Color Kit Box for Circuit Science Experiment, DIY Lighting Projects 10 Colors
$131.00 AUD
DiCUNO 100Pcs (10 Colors × 10Pcs) 5MM Pre Wired 12V LED Diodes, 9.4 Inch/24CM Ultra Bright Light Emitting Diodes Assorted Color Kit Box for Circuit Science Experiment, DIY Lighting Projects Product Features DiCUNO prewired 12V 5MM transparent LED light diodes, 10 light colors: Red/Green/Blue/Yellow/Pink/White/UV/Orange/Warm White/...
DiCUNO 450pcs (5 Colors x 90pcs)...
![[Australia - AusPower] - DiCUNO 450pcs (5 Colors x 90pcs) 5mm LED Light Emitting Diode Round Assorted Color White/Red/Yellow/Green/Blue Kit Box](http://auspowers.com/cdn/shop/products/B073QMYKDM_1024x.jpg?v=1648586275)
DiCUNO 450pcs (5 Colors x 90pcs) 5mm LED Light Emitting Diode Round Assorted Color White/Red/Yellow/Green/Blue Kit Box
$127.00 AUD
DiCUNO 450pcs (5 Colors x 90pcs) 5mm LED Light Emitting Diode Round Assorted Color White/Red/Yellow/Green/Blue Kit Box Product Features Head Type: Round; Head Diameter: 5mm; Pin Length: 18 mm. Forward Voltage: R/Y 2.0-2.2V; B/G/W 3.0-3.2V; Max. Current: 20mA. Wavelength Range: Red, 620-625nm; Yellow, 590-595nm; G...
ELEGOO 3mm and 5mm Diffused and...
![[Australia - AusPower] - ELEGOO 3mm and 5mm Diffused and Clear Assorted LED Kit 5 Colors with UV, RGB CA, Fast Flashing Compatible with Arduino (Pack of 350) A)pack of 350(3mm and 5mm 5 Colors)](http://auspowers.com/cdn/shop/products/B0739VKXYG_1024x.jpg?v=1648586240)
ELEGOO 3mm and 5mm Diffused and Clear Assorted LED Kit 5 Colors with UV, RGB CA, Fast Flashing Compatible with Arduino (Pack of 350) A)pack of 350(3mm and 5mm 5 Colors)
$117.00 AUD
ELEGOO 3mm and 5mm Diffused and Clear Assorted LED Kit 5 Colors with UV, RGB CA, Fast Flashing Compatible with Arduino (Pack of 350) Product Features 3mm and 5mm Clear Round Head LED Kit With UV, RGB Common Anode, Common Cathnode, Fast Flashing, Slow Flashing (All 10pcs) View Angle:15~30 Degree. Wavelength Range:...
Chanzon 120pcs (6 Colors x 20pcs...
![[Australia - AusPower] - Chanzon 120pcs (6 Colors x 20pcs) 12V 5mm LED Diode Copper Lights 7.9 inch 24awg Pre Wired Assorted Kit (Transparent Clear Round Lens) White Red Green Blue Yellow Warm-White Emitting LED Assortment A) 6 Colors X 20pcs = 120pcs](http://auspowers.com/cdn/shop/products/B08G4X23BR_1024x.jpg?v=1648585074)
Chanzon 120pcs (6 Colors x 20pcs) 12V 5mm LED Diode Copper Lights 7.9 inch 24awg Pre Wired Assorted Kit (Transparent Clear Round Lens) White Red Green Blue Yellow Warm-White Emitting LED Assortment A) 6 Colors X 20pcs = 120pcs
$124.00 AUD
Chanzon 120pcs (6 Colors x 20pcs) 12V 5mm LED Diode Copper Lights 7.9 inch 24awg Pre Wired Assorted Kit (Transparent Clear Round Lens) White Red Green Blue Yellow Warm-White Emitting LED Assortment Read more Prewired Led Kit Colored Prewired Led Kit SMD Led 0603 Kit SMD Led 0805 Kit SMD Led 1206 Kit Size 5mm 5mm 0603 0805 1206 Pieces 120pcs 120p...
JABINCO 100pcs 3mm LED Light Dio...
![[Australia - AusPower] - JABINCO 100pcs 3mm LED Light Diodes, Red/Green/Yellow/Blue/White LED Circuit Assorted Kit for Science Project Experiment](http://auspowers.com/cdn/shop/products/B0827KYRFH_1024x.jpg?v=1648584810)
JABINCO 100pcs 3mm LED Light Diodes, Red/Green/Yellow/Blue/White LED Circuit Assorted Kit for Science Project Experiment
$74.00 AUD
JABINCO 100pcs 3mm LED Light Diodes, Red/Green/Yellow/Blue/White LED Circuit Assorted Kit for Science Project Experiment Specifications: Head type: round Forward voltage: R/ Y 2.0-2.2V; G/ W/ B 3.0-3.2V Max. current: 20 mA Package includes: 20x 3mm Green LED 20x 3mm Red LED 20x 3mm White LED 20x 3mm Blue LED 20x 3mm Yellow LED Product Features...