{"product_id":"the-voip-lounge-25-foot-flat-black-long-handset-receiver-curly-phone-cord-with-long-lead","title":"The VoIP Lounge 25 Foot Flat Black Long Handset Receiver Curly Phone Cord with Long Lead","description":"\u003ch3\u003eThe VoIP Lounge 25 Foot Flat Black Long Handset Receiver Curly Phone Cord with Long Lead\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eThe VoIP Lounge Universal Flat Black 25 Foot Handset Cord with long lead. This\nis a flat black cord that is 25 feet long when it is fully extended to its\nmaximum length, and is about 42 inches in its coiled, unstretched state.\nHandset cords are rarely used at their maximum length, and most typically\nusable anywhere from 35% to 75% of their advertised length, depending on how\nmuch you want to stretch them. Once stretched to the maximum length, cords do\nnot retain their original shape or quality, so it's important to choose wisely\nwhen buying. The advertised size of the full maximum extended length is a\nTelecom Industry Standard, and not something that is decided by us, or any\nother manufacturer or seller. Cords \u0026amp; Lengths: Available lengths for most\ncords are: 7 feet (11 inches coiled \/ unstretched) 9 feet (15 inches coiled \/\nunstretched) 12 feet (22 inches coiled \/ unstretched) 25 feet (42 inches\ncoiled \/ unstretched)\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n  \u003cul class=\"a\"\u003e\n         \u003cli\u003e25 Feet fully stretched, 3.5 Feet coiled (See Full Description Below)\u003c\/li\u003e\n         \u003cli\u003eBlack Color\u003c\/li\u003e\n         \u003cli\u003eBrand New - Individually Bagged\u003c\/li\u003e\n         \u003cli\u003ePlease read the description regarding Telecom Industry Standard Cord Lengths\u003c\/li\u003e\n  \u003c\/ul\u003e\n\n","brand":"The VoIP Lounge","offers":[{"title":"Default Title","offer_id":41372978348212,"sku":"B07FK33KRY","price":115.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0595\/9906\/1172\/products\/B07FK33KRY.jpg?v=1649766822","url":"https:\/\/auspowers.com\/products\/the-voip-lounge-25-foot-flat-black-long-handset-receiver-curly-phone-cord-with-long-lead","provider":"AusPower Australia","version":"1.0","type":"link"}