{"product_id":"100pcs-5mm-white-lights-led-diodes-flat-lens-29mm-long-lead-dc-3v-100pcs-resistors-for-dc-6-12v-included-bright-bulb-lamps-light-emitting-diode-03-white-100pcs-5mm-flat-top","title":"100pcs 5mm White Lights LED Diodes Flat Lens 29mm Long Lead (DC 3V) +100pcs Resistors (for DC 6-12V) Included, Bright Bulb Lamps Light Emitting Diode [03] White \/ 100pcs 5mm Flat Top","description":"\u003ch3\u003e100pcs 5mm White Lights LED Diodes Flat Lens 29mm Long Lead (DC 3V) +100pcs Resistors (for DC 6-12V) Included, Bright Bulb Lamps Light Emitting Diode\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eLow Energy Consumption And Low Heat.  Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation.  Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F  Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F  Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature.  Get other LED models? Please search \"EDGELEC Diodes\".\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n  \u003cul class=\"a\"\u003e\n         \u003cli\u003eProduct Overview: 100 pcs LED Diodes + 100 pcs Resistors\u003c\/li\u003e\n         \u003cli\u003eProduct Features: White Lights \/ 5mm Flat Clear Lens Lens\u003c\/li\u003e\n         \u003cli\u003eProduct Parameters: 29mm Long Lead \/ DC 3.0V-3.2V (IF=20mA) \/ 0.06 Watts \/ 2pin \/ DIP LEDs\u003c\/li\u003e\n         \u003cli\u003eProduct Parameters: Luminance Brighter Up To +20% \/ Wavelength 6000K-9000K \/ 60 Viewing Angle \/ Single LED Diodes Wight: 0.24g\u003c\/li\u003e\n         \u003cli\u003eAccessories: 100pcs 430ohm (For DC 6-12V) 1\/4 Watt Metal Film Resistors Include \/ 1% Tolerance\u003c\/li\u003e\n  \u003c\/ul\u003e","brand":"EDGELEC","offers":[{"title":"Default Title","offer_id":43644050735284,"sku":"B0785FPG3T","price":101.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0595\/9906\/1172\/files\/B0785FPG3T.jpg?v=1728631205","url":"https:\/\/auspowers.com\/products\/100pcs-5mm-white-lights-led-diodes-flat-lens-29mm-long-lead-dc-3v-100pcs-resistors-for-dc-6-12v-included-bright-bulb-lamps-light-emitting-diode-03-white-100pcs-5mm-flat-top","provider":"AusPower Australia","version":"1.0","type":"link"}